§ 24.22. New driveway drainage requirements.
Proposed grades along a new or improved driveway shall not direct stormwater runoff to an adjacent property. Driveways shall be constructed so as to maintain drainage on the property on which the new driveway is constructed. Driveway designs shall be submitted to and approved by the City's Engineering Division prior to issuance of a permit. Acceptable designs may include, but are not limited to: a three-inch-high curb along the edge of the driveway, landscape timbers, or special grading of the pavement. A new driveway shall not increase stormwater runoff to an adjacent property.
(Ord. 12-2006 § 2 (part))